Zorlu Center Metro - Metrobus Pedestrian Transition Tunnel Project

This project is removing the circulation to underground for facilitate the pedestrian circulation and reduce the travel times for pedestrian between Zorlu Center – Gayrettepe Metro Station – Zincirlikuyu Metrobus Station. In this project there are 717,00 m tunnel , 3 cut cover tunnel Σ 250,00 m , 2 shafts of Ø 12,00 m , 2 shaft Ø 4,50 m for lift.

  • Place:İstanbul
  • Partnership :
  • Employer: Istanbul Metropolitan Municipality
  • Scope: Metro and Metrobus Pedestrian Connection Tunnel Construction
TUNNEL DEEP EXCAVATION WORKS MINE PREPARATION