Station Basak 4, deep foundation excavation works

In this project deep foundation excavation, support works, wire mesh, anchorage and shotcrete of the Basaksehir 4 Station and exit portal of the tunnel of Olimpiyat Koyu are realized with using two shafts for these construction, one of this shafts has 10 m diameter and 24,75 m depth and the other one has 10 m diameter and 42 m depth.

  • Place:Istanbul /TURKEY
  • Partnership :
  • Employer: Istanbul Metropolitan Municipality
  • Scope:
TUNNEL DEEP EXCAVATION WORKS MINE PREPARATION